A Zero Energy-Capable Building: Kirsch Center for Environmental Studies

Case Study / April 25, 2012 / Getting to Zero

For this two-story building in Cupertino, CA the design process moved through six steps to responsibly approach carbon neutral operation and roughly track increasing cost effectiveness.

Download